<!-- Published by AIMasterz at https://aimasterz.com/docs/templates/07-scorecard.md . Part of the Company OS Method: https://aimasterz.com/docs/method -->

# Scorecard — <Digital Employee name>

Stages 7 and 8 of the [method](https://aimasterz.com/docs/method). Calibration compares the role against the baseline; operation repeats the scorecard monthly.

## Baseline

| Measure | Baseline value | Source | Period |
| --- | --- | --- | --- |

## Thresholds and results

| Measure | Threshold | Calibration result | Month 1 | Month 2 | Month 3 |
| --- | --- | --- | --- | --- | --- |
| Outcome KPI(s) | | | | | |
| Drafts accepted without material edits | ≥ 75% after calibration | | | | |
| Manager time per day | | | | | |
| Unapproved or duplicate actions | 0 | | | | |
| Failures visible to the operator within | 5 minutes | | | | |
| Cost per month | | | | | |

## Failure injection

| Case | Expected behavior | Result |
| --- | --- | --- |

## Autonomy review

| Action class | Approvals so far | Material-edit rate | Proposed change | Decision |
| --- | --- | --- | --- | --- |

## Sign-off

| Role | Name | Date | Decision |
| --- | --- | --- | --- |
| Manager | | | go / no-go |
